Description
This Safe Work Method Statement outlines the general requirements to undertake wheeled dozer activities in a safe and structured manner.
Job steps include pre-planning, training / competency, equipment, emergency response, specific job steps (Cabin access/egress, traverse to work area, establishing exclusion zones, general operations, planned and corrective maintenance and continuing operations until complete), monitoring, completion of task and demobilisation from work area.
This Safe Work Method Statement utilises the AllSafety Risk Matrix and all activities are risk assessed based on the inherent and residual risk model.
This Safe Work Method Statements provides a basic outline of activity, potential hazards and recommended controls with provision to include activity specific requirements and personnel who are responsible for the review, approval and monitoring aspects of the activity.
Format: Word
Pages: 8 (1 x cover page, 1 x risk matrix and criteria, 5 x activity breakdown, 1 x sign on sheet)




